Hardware

Compute for Foresight(ML)

  • Aizen’s compute infrastructure needs a minimum of

    • 1 master node with 8 cores, 32GB memory and 500GB disk for operating system

    • 1 worker node with 32 cores, 128GB memory and 500GB disk for operating system

    • 1 gpu worker node (1x NVIDIA A100 PCIe) - Optional for remote training

Compute for Orchestrate

  • Aizen’s compute infrastructure needs a minimum of

    • 1 master node with 8 cores, 32GB memory and 500GB disk for operating system

    • 1 worker node with 16 cores, 64GB memory and 500GB disk for operating system

Note

  • Make sure to have additional storage disks for your data on each worker node as required by your use case
    • Minimum disk size of 1TB each per worker but recommendation would be 2TB each per worker node

Once the hardware is ready please refer Aizen prerequisites